Urgency under Section 12A of the Commercial Courts Act, in suits for continuing patent and design infringement, is judged from the plaint and documents from the plaintiff's standpoint; mere delay does not negate it, so the plaint was wrongly rejected.
Facts
The appellant, a Danish manufacturer of industrial fans, appointed the first respondent as its Indian dealer in 2017. It alleged that the dealer's director set up the second respondent to make and sell identical fans under a deceptively similar name. After discovering the competing products in 2022, terminating the dealership and sending a cease-and-desist notice, the appellant had an expert inspect the fans in December 2023 and filed a commercial suit for patent and design infringement in June 2024, with an application for an interim injunction and an application for exemption from pre-institution mediation under Section 12A. A Single Judge of the Himachal Pradesh High Court rejected the plaint under Order VII Rule 11 CPC, holding that the delay showed no genuine urgency. A Division Bench dismissed the appeal. Mediation directed by the Supreme Court later failed.
Questions before the Court
- Whether a suit alleging continuing infringement of patent and design rights, with a prayer for interim injunction, contemplates urgent interim relief within Section 12A of the Commercial Courts Act despite delay in filing.
- What test governs whether a commercial suit contemplates urgent interim relief so as to dispense with pre-institution mediation.
What the Court held
- Section 12A requires pre-institution mediation, but a plaintiff is exempt where the plaint and annexed documents, read as a whole, show a real need for urgent interim relief. A proforma prayer used as a device to skip mediation will be ignored.
- The court does not examine the merits of the urgent relief. If the relief seems plausibly urgent from the standpoint of the plaintiff, the court can dispense with the Section 12A requirement.
- In actions alleging continuing infringement of intellectual property rights, urgency must be assessed in the context of the ongoing injury and the public interest in preventing deception. Each act of manufacture or sale is a fresh wrong.
- Mere delay in instituting a suit does not by itself negate urgency when the infringement is continuing.
- The High Court erred by examining entitlement to relief on the merits and treating the time lag as negating urgency. The orders were set aside and the suit restored to the High Court's file.
Why it matters
The judgment applies and summarises the earlier decisions on Section 12A into a five-point test for when a commercial suit contemplates urgent interim relief. It holds that in suits for continuing infringement of intellectual property, urgency lies in the persistence of the injury rather than the age of the cause of action, and that insisting on mediation in such cases would leave the plaintiff without a remedy.
In the Court's words
Copied from the official judgment; each passage links to its page.
“The court is not concerned with the merits of the urgent relief, but if the relief sought seems to be plausibly urgent from the standpoint of the plaintiff the court can dispense with the requirement under Section 12A of the Act.”
“The subject matter of the present action is continuing infringement of intellectual property. Each act of manufacture, sale, or offer for sale of the infringing product constitutes a fresh wrong and recurring cause of action.”
“The appellant's prayer for injunction cannot be characterised as mere camouflage to evade mediation. It is a real grievance founded on the continuing nature of infringement and irreparable prejudice likely to be caused by the delay. The court must look beyond time lag and evaluate the substance of the plea for interim protection.”
“The learned Single Judge as well as the Division Bench of the High Court erred in construing the test for urgent relief enumerated in Section 12A of the Act, in as much as the courts have proceeded to examine the entitlement of the appellant to urgent relief based on the merits of the case rather than looking at the urgency as is evident from the plaint and the documents annexed thereto from the standpoint of the plaintiff.”
Provisions interpreted
Case and bench
- Parties
- Novenco Building and Industry A/S v. Xero Energy Engineering Solutions Private Ltd.
- Case
- Civil Appeal No. of 2025 (arising out of S.L.P. (C) No. 2753 of 2025)
- Decided
- 27 October 2025
- Bench
- Sanjay Kumar, Alok Aradhe
- Opinions
- Unanimous. Judgment of the Court delivered by Alok Aradhe, J.
A case of your own on this point of law? Talk to a lawyer on LegalFirms.in, free to send.